A great friend and co-worker of mine just happens to be dating an HVAC guy. Perfect! He spent most of last weekend doing some serious work for us. He brought along a second crew member, and the two of them ran four duct lines from the basement to the second story addition above our garage. In total, it took almost 10 hours, 300 feet of duct work, and lots of digging, cutting and tunnelling in the dirt of our crawlspace.
Here's just a few shots of what they accomplished.
They ran four duct lines off of the main trunk line that ran through our crawlspace. The dirt floor had to be dug out and removed to give them access. The four lines run to the back of the basement and come up through the garage floor and up the wall. They then branch off to the four vents that were installed in our bedroom and closet.
Once again, we went with black cast iron floor grates to match the one we used in the bathroom. I'm happy to say that the night they finished, the temperature dropped to 2 degrees, and we didn't even need the fireplace. It's nice to have heat!
We were talking about some of the larger projects we've done since we moved in at the end of June. Although we've done a lot, it often feels like we haven't because much of what we have completed is behind the walls. Having the electrical replaced, and now this HVAC work done was costly and very necessary. But it didn't make a big impact in the look of the house. Hopefully some of the next few projects will really start to change how the house looks and make it feel like our home.
Here's a list of a few of the projects we have scheduled to happen within the next few weeks:
-rock retaining wall in side yard
-repair wood soffits and eavestroughs
-remove two windows in the mud room
-replace two windows in the master closet and craft room
-drywall ceiling in living room
Hopefully that's enough to keep us busy for the next few weeks!